Demolition, land clearing and site development around Murphy, NCDemolition and land clearing in Murphy, NC
Sanders Contracting
Two workers spraying green hydroseed mulch over the graded front yard of a new house, hydroseeding
Our Services

Hydroseeding in Murphy, NC

Hydroseeding · Murphy, NC

Seed and mulch sprayed on to hold bare ground

Hydroseeding plants grass by spraying seed onto bare ground. The seed and fertilizer go into a tank with water and a fiber mulch. The slurry is sprayed across the ground, and its green dye shows where it has landed. Sanders Contracting does hydroseeding for new lawns, graded house sites, cleared lots and cut banks around Murphy.

Hydroseeding often comes last, after land clearing or the grading for a new house. Murphy averages about 59 inches of rain a year, and a hard storm carries bare dirt downhill. A stand of grass gives the soil a root mat and leaf cover to hold it. Call or text (828) 342-1467, and we look at the ground and put the quote in writing.

What We Handle

  • New lawns hydroseeded around new homes and buildings
  • Graded yards and slopes seeded once the dirt work is done
  • Cleared lots and acreage seeded after land clearing
  • Cut and fill banks along driveways seeded for erosion control
  • Seed and mulch sprayed together in one slurry
  • Steep banks seeded where equipment cannot be driven
  • Rough grading with our excavators when the ground needs shaping first

Request a Hydroseeding Quote

Tell us what you need done and where the property is. We look at the job and put the quote in writing.

What Our Hydroseeding Services Cover

We hydroseed new lawns and the graded ground around new construction. We also seed cleared lots and the cut and fill banks along driveways. Each of these starts as raw dirt with nothing growing on it.

A hand-seeded bed needs fine, loose soil. The state's erosion control manual says hydroseeded ground can be left rougher, with large clods and stones. A lawn near the house still gets a smooth final grade. The extension service calls for a 2 to 3 percent slope so water drains away from the house.

When the ground needs shaping first, our excavators do the rough grading. Then the seed and the mulch go on together in one pass. The manual says to spray seed and fertilizer within 30 minutes of mixing them.

When Is the Best Time to Hydroseed a Lawn Around Murphy?

Late summer, as the weather cools, is the best time. The extension service puts the best seeding window for mountain lawns at August 15 to September 1. That window covers tall fescue and Kentucky bluegrass, two cool-season grasses suited to the North Carolina mountains. Fall is also the driest season near Murphy in federal weather records, so plan to water the new seed.

Spring seeding is the fallback. The extension service says spring seedlings often run out of time to root before summer heat and drought. The state's erosion control manual adds that mountain seedings in December and January have poor chances of success.

A building site cannot always wait for August. A quick temporary grass can hold the soil through spring and summer. The lawn grass then goes in when the late summer window opens. Above 2,500 feet, the manual's late winter and spring seeding dates run two weeks later.

Hydroseeding Slopes and Banks for Erosion Control in Western North Carolina

On most building sites, state law sets a clock on bare slopes. Graded slopes left exposed must be planted or covered within 21 calendar days of finishing a phase of grading. The law also says a graded slope can be no steeper than its vegetation or a structure can hold.

Erosion control applies no matter how small the job is, the state says. Work that disturbs more than one acre also needs an approved erosion control plan. That plan is normally filed at least 30 days ahead. Some cities and counties run their own erosion programs, which can be stricter, so ask the local office.

On slopes steeper than 3:1, the state's erosion control manual calls mulch essential to seeding success. A 3:1 slope rises one foot for every three feet across. The manual also names south-facing cut banks and rocky or clay soils as hard places to start grass. Where a bank is too steep for grass to hold, a retaining wall can take height out of the slope.

Worker spraying hydroseed mulch over a bare backyard among tall trees, hydroseeding Worker on a hydroseeder truck spraying green slurry across a graded open lot, hydroseeding

Ready to get started?

Call or text for a written quote. We work about 100 miles around Murphy across western North Carolina, north Georgia and east Tennessee.

(828) 342-1467
How We Work

How a Job With Sanders Contracting Runs

From the first call or text to the finished work, here is how it goes.

1

Call or Text

Call or text (828) 342-1467 or (828) 361-8764 with the address and what has to come down or get cleared.

2

We Look at the Job

We look at what has to come down and how the excavator gets in. Steep lots and soft ground change how a job runs.

3

Your Quote in Writing

You get the quote in writing, with the work spelled out. When you say yes, we set a date.

4

Before the Work Starts

You have the utility shut off power and gas. The public lines get marked through NC 811 before any digging or demolition.

5

Tear Down and Haul Off

The excavator takes the structure down and the dump truck hauls the debris off. We leave the lot cleaned up and ready for what comes next.

FAQ

Hydroseeding Questions, Answered

Common questions about hydroseeding around Murphy and the rest of the tri-state area. If yours is not here, call or text and ask.

Call (828) 342-1467

How much does hydroseeding cost?
The size of the area and how steep it is drive the price. Grading or cleanup before the seed adds to it, and so does a bank that is hard to reach. We look at the ground and put the quote in writing. Call or text (828) 342-1467.
Should I hydroseed or lay sod?
Sod covers the ground the day it goes down. The state's erosion control manual calls it the more reliable cover. Sod also costs more to install than seed and has to be watered in the early weeks. Hydroseeding costs less up front, and the new grass needs steady water while it fills in.
How do I water new hydroseed?
Keep the seedbed moist with light watering several times a day, the extension service says. Do not let the seedlings dry out. Keep foot traffic off the new grass as much as you can. The extension service counts a new lawn as established once it has been mowed three times.
Can you hydroseed a steep bank?
Yes. The state's erosion control manual says hydroseeding suits steep slopes where equipment cannot be driven. The manual adds that netting holds mulch in place on slopes until the grass takes. We look at the bank and tell you what it needs before we quote.
Do I need a soil test before hydroseeding?
The extension service says it is best to test the soil before a new lawn goes in. The test shows how much lime and fertilizer the ground needs. Your county's extension center has the sample boxes, and the state lab runs the test. Allow several weeks for the results.
Where do you do hydroseeding?
We work from Murphy across the tri-state area where North Carolina meets Georgia and Tennessee. Our service area page lists the towns by name. Call or text to set up a time for us to look at the ground.
More From Sanders Contracting

Work That Pairs With Hydroseeding

Excavator with a thumb sorting a pile of demolition debris beside a high sided dump trailer, debris removal

Debris Removal

We haul off demolition, construction and storm debris with the excavator and the dump truck. Brush piles and stumps go too, and the site is left clean.

Learn More
Excavator tearing into the side of a two story vinyl sided house, house demolition

House Demolition

We tear down old houses and cabins, including homes hurt by fire or storms. The debris goes out on our dump truck, and the lot is left clean for what comes next.

Learn More
Debris pile of a torn down home with metal siding, insulation and a mattress, an excavator behind, mobile home demolition

Mobile Home Demolition

We tear down single wide and double wide mobile homes and haul them off in our dump truck. The lot is left cleaned up and ready for a new home or a new pad.

Learn More
Why Choose Sanders Contracting

Demolition, Land Clearing and Site Development Around Murphy

Based in Murphy

We are based in Murphy, in Cherokee County. We take jobs across the tri-state area where North Carolina meets Georgia and Tennessee.

Excavators and a Dump Truck

A large excavator and a small one do the tear-down. Our dump truck hauls the debris off, so one company handles the whole job.

The Quote in Writing

We look at the job before we price it. You get the quote in writing, with the work spelled out.

Guides and Resources

Hydroseeding Guides

Request a Quote

Get In Touch With Sanders Contracting

Tell us what has to come down or get cleared, and where the job is. Call or text (828) 342-1467 or (828) 361-8764, or send the form, and we set a time to look at it.

Request a Quote

Tell us what you need done and where the property is. We look at the job and put the quote in writing.

Call (828) 342-1467